As anAreaCost Control Engineeron the $3.3BN Hampton Roads Bridge Tunnel Expansion Project (HRBT) in Virginia, you willassist the project team in the tracking, reporting and troubleshooting of all relevant cost and schedule information across an assigned area of the project.
The Hampton Roads Connector Partners JV (HRCP) consisting of Flatiron, Dragados USA and VINCI,has been selectedto construct the $3.3BN Design Build project -the largest civil construction contract ever awarded by the Virginia Department of Transportation (VDOT).
The project scope across a 9 mile section of the I-64 will include: a new 3.5-mile bridge-tunnel crossing that will accommodate a total of 8 lanes of capacity across the water, replacement of the existing marine approach bridges and the addition of a third lane on I-64 in each direction.The twin 45' diameter 1.5-mile tunnelswill be boredby TBM, creating the second largest TBM tunnel opening for a TBM in North America.The projectis expectedto continue to the end of 2025.
Responsibilities:
Subscribe to job alerts and upload your resume!
*By registering with our site, you agree to our
Terms and Privacy Policy.